DOI: 10.15393/j2.art.2008.1823
Golshtein G Yu | PetrSU, @ |
Key words: parametric refusal economic criterion technical capacity accounting prime cost revenue rate |
Summary: The supplying with profitable work of manufacturing equipment of logging machines owning to control change of parameter prime cost. |